Forming part of a package of enabling works, Pro Rail Services was instruction to carry out tasks including vegetation clearance, arborist works, track removal, formation grading works, and survey, design & assurance works for a new ramp installation.
Pro Rail Services was commissioned to repair the track drainage system at Beltring in Kent Timescales were tight following a number of flooding events. We were awarded the contract with two weeks to plan the works and mobilise our teams.
Pro Rail Services was commissioned by Network Rail’s Tottenham Delivery Unit to brush cut an 8,000m long, 3m wide section of cess in order to clear the drainage ditch and allow water to flow.
Wiht the local area prone to track flooding events induced by high vegetation to the drainage ditches, Pro Rail Services was commissioned to brush cut a 1000m long, 3m wide section of cess to allow water to flow.
Taking place on Network Rail’s Anglia Route, this vegetation management project consisted of dense vegetation and high level vegetation on a retaining wall on both the DOWN mains and the UP electrics on LTN1.
Taking place on Network Rail’s Anglia Route, this vegetation management project consisted of dense vegetation and high level vegetation on a retaining wall on both the DOWN mains and the UP electrics on LTN1.