24/7 reactive railway infrastructure call out support available 365 days/year. Need our help? Get in touch Need our help? Get 24/7 support
01707 927 400

Blog Archives

Norwich Victoria Sidings – Enabling Works

Forming part of a package of enabling works, Pro Rail Services was instruction to carry out tasks including vegetation clearance, arborist works, track removal, formation grading works, and survey, design & assurance works for a new ramp installation.

Beltring – Ditch Clearance

Pro Rail Services was commissioned to repair the track drainage system at Beltring in Kent Timescales were tight following a number of flooding events. We were awarded the contract with two weeks to plan the works and mobilise our teams.

Cricklewood to Stansted – CAW – Vegetation & Ditch Clearance Works

Pro Rail Services was commissioned by Network Rail’s Tottenham Delivery Unit to brush cut an 8,000m long, 3m wide section of cess in order to clear the drainage ditch and allow water to flow.

Belvedere De-Vegetation Project

Wiht the local area prone to track flooding events induced by high vegetation to the drainage ditches, Pro Rail Services was commissioned to brush cut a 1000m long, 3m wide section of cess to allow water to flow.

Highbury & Islington to Dalston Kingsland – Vegetation Clearance Works

Taking place on Network Rail’s Anglia Route, this vegetation management project consisted of dense vegetation and high level vegetation on a retaining wall on both the DOWN mains and the UP electrics on LTN1.

Forest Gate to Manor Park Station – Vegetation Clearance Works

Taking place on Network Rail’s Anglia Route, this vegetation management project consisted of dense vegetation and high level vegetation on a retaining wall on both the DOWN mains and the UP electrics on LTN1.