24/7 reactive railway infrastructure call out support available 365 days/year. Need our help? Get in touch Need our help? Get 24/7 support
01707 927 400

Blog Archives

Newnham Tunnel – Drainage Reprofiling and Fencing Renewals

Pro Rail Services were contracted to reprofile 200m of earthworks drainage ditch around Newnham Tunnel Portal, on Western and Wales Route SWM2 123m 76ch.

Liverpool Street – Jetting and CCTV Survey

Pro Rail Services was commissioned by Network Rail to jet, survey and map the drainage system in the area, identifying key points such as outfalls, flow directions, invert levels and connections between the cess and 6 foot drainage systems.

Belvedere Track Drainage Installation

Rail services through Belvedere Railway Station in the London Borough of Bexley were being compromised by poor track drainage causing wet beds. This resulted in temporary speed restrictions having to be put in place, adversely affected the reliability of passenger services.

Bacton Embankment – Toe Drainage Emergency Works

We were contacted by our client at Norwich DU to resolve a Reactive Call Out problem with flooding to the rear of houses at the toe of an embankment which was part of the Railway Infrastructure at Bacton, near Norwich.